Project Name: |
Anchorage museum expansion |
Installation Criteria: |
Groute 5.5″ Helical pile |
Project Lead: |
Ben Cruz |
Equipment: |
Cat 299 and HD50 low headroom driver |
Installation Depths: |
10′ to 25′ |
Jobsite Restrictions: |
Within 2″ of buildings and walls, narrow access ways and low head room |
Geotechnical Concerns: |
ground water, soil settlement, dense layers sitting on top of weaker soils |
Pileworks supplied: |
Helical piles & tooling for APE HD driver |
Time to Install single unit: |
10 min to install ea piling |
Pileworks job influence: |
Designed drill tooling to install and grout piles simultaneously |
|
|
|
Description: |
Pileworks presented the only option to deliver a high capacity pile while working with less than 10′ of height. |